Skip to content
DAVMELREMODELING
Walk-in shower with glass slider, marble look tile and niches

Tub to Shower Conversion

The tub goes out, a waterproofed walk in shower goes in. Our most requested bathroom job, usually five to eight days.

The tub to shower conversion is the most requested job we do. Most people stand in their tub to shower anyway, stepping over a 15 inch wall twice a day. Taking the tub out and building a real walk in shower makes the room feel bigger, makes it safer, and makes it easier to clean, all in about a week of work.

Here is the part other websites skip: the drain. A tub drain sits at the end of the alcove, and a shower drain usually wants to be closer to the center, which means opening the floor and rerouting pipe between the joists. Most of the time it is routine. Once in a while a joist or a main line sits exactly where the drain wants to go, and the layout adjusts. We tell you which case you have during planning, not on day three.

Everything gets built as a tested system: sloped pan, waterproofing membrane on the walls and floor, a flood test held overnight before a single tile goes on, and solid blocking in the walls so grab bars can go up now or ten years from now. You can walk through a finished one in our [Lancaster tub to shower conversion](/projects/tub-to-shower-conversion-lancaster-pa) case study.

WHAT WE DO

Tub to Shower Conversion: the full scope

Demo and haul off

Tub, surround and old walls out, debris gone the same day. Cast iron tubs leave in pieces, loudly, but only for an hour.

Plumbing relocation

Drain moved to the shower location and the valve set at shower height, coordinated with a licensed plumber.

Waterproofing as a system

Sloped pan, membrane on walls and floor, and a flood test before tile. This is the part that decides how the shower ages.

Tile walls and floor

Porcelain, marble or subway tile with niches and benches where you want them.

Glass

Sliding doors or fixed panels measured after tile, so they fit the real opening instead of the drawing.

Grab bar blocking

Solid wood blocking in the walls as standard, so bars can be added anytime without hunting for studs.

HOW IT GOES

Our process, step by step

  1. 1

    Estimate and materials

    We measure, talk through the layout and lock in tile, base and glass before demo. Nothing starts until materials are on site.

  2. 2

    Demo and rough in

    Days one and two. Tub out, walls open, drain and valve relocated, blocking installed.

  3. 3

    Waterproofing and tile

    Pan built and flood tested, membrane up, then tile. The middle of the week belongs to the part you will never see again.

  4. 4

    Glass and punch list

    Glass installed, fixtures set, silicone cured, and a final walkthrough together before we call it done.

HONEST NUMBERS

What it costs around here

2026 ranges, written quotes are free and exact

Tub to Shower Conversion price ranges
Tub to shower conversion, complete$7,000 to $14,000
Drain or valve relocation, complex casesadd $600 to $1,500
Upgrade to frameless glassadd $800 to $1,500
Grab bars installed on blocking$150 to $300 each

2026 ranges for Lancaster and Chester County. The spread covers tile selection and how far the drain has to travel. Written quotes are free and exact.

FROM OUR JOBS

Photos from real sites

Walk-in shower with glass slider, marble look tile and niches
Tub surround demolition with stripped tile walls
PVC shower pan liner installed in a framed shower stall
Marble look shower wall tile being installed
New tub with marble look tile surround and tiled floor
Subway tile shower and hex marble floor mid remodel

EVERY PHOTO: OUR CREW, OUR CLIENTS' HOMES. NO STOCK.

GOOD QUESTIONS

Questions we hear a lot

Does removing the tub hurt resale value?

If it is the only tub in the house and you might sell within a few years, think twice. Families with small kids look for at least one tub, and appraisers notice. If another bathroom has a tub, or you plan to stay put, convert without guilt. We have talked people out of this job for exactly that reason.

How long does a tub to shower conversion take?

Five to eight working days is typical. Drain relocation and tile complexity set the pace. Glass sometimes arrives a few days after tile because it is measured against the finished opening, so plan on full use within two weeks of demo day.

Can you just put an acrylic insert over everything instead?

Insert companies exist and they are faster. What a cover up cannot do is fix what is under the old tub, and there is often something under the old tub. We open it up, repair the subfloor and framing, and build tile that outlasts any liner. Different product, different price, different decade of service.

WHERE WE WORK

Tub to Shower Conversion across Lancaster & Chester County

FREE WRITTEN ESTIMATES

Planning tub to shower conversion? Send photos.

Snap the room or the problem, send the form, and we call back with a real ballpark the same business day. Or talk first: (717) 210-8194

PHOTOS FOR A PRELIMINARY QUOTE (OPTIONAL, UP TO 4)

Snap the room, the problem, or the thing you want gone. Photos let us call back with a real ballpark instead of twenty questions.

We reply the same business day. No spam, ever.

PA HIC #PA214721· LICENSED & INSURED · SERVING LANCASTER + CHESTER COUNTY

Call (717) 210-8194Free Estimate